Curb Transportation System (Logistics)

Render 3Render 1

Curb Transportation System: (Work in progress)

The infrastructural concept here is to create an infrastructural logistics (delivery units or trolleys) that are limited within the curb zones of a typical street. Curb zones are usually null zones that serves no purpose in a vertical aspect. With this system, the zone is utilized and creates a seamless transition between electrical poles, and functional infrastructure.

Projected Materials:

Steel

Construction Document:

Coming Soon.

 

Last Updated: June – 27 – 2017

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s